Stand Alone Operation of SEIG by Using Fixed Capacitor Thyristor Controlled Reactor

Main Article Content

Prathmesh B. Bhurke, Shankar S. Vanamane

Abstract

The major aspect of this paper is to solve the off-grid operational problems of SEIG system. When the SEIG system is get directly connected with utility due to a different loading conditions and also accordingly to different prime mover conditions terminal voltage fluctuations occurred. Our main aim is to define the system voltage up to a permissible terminal voltage level by using Fixed Capacitor Thyristor Controlled Reactor.

Article Details

How to Cite
, P. B. B. S. S. V. (2016). Stand Alone Operation of SEIG by Using Fixed Capacitor Thyristor Controlled Reactor. International Journal on Recent Technologies in Mechanical and Electrical Engineering, 3(1), 35–38. Retrieved from https://ijrmee.org/index.php/ijrmee/article/view/33
Section
Articles